This unique home was built in the 1970’s and the owners thought it wise to include a bomb shelter
in the construction. Through an unfortunate incident, a large amount of oil was spilled into the
soil in the area around this bomb shelter. Due to environmental concerns, the soil had to be excavated.
In order to accomplish this without damaging the structure, the engineer of record recommended
1) installing helical piers around the area to stabilize the load bearing walls and 2) install chemical
grout 8 to 10 ft into the soil in a curtain-like fashion to prevent the soil from sliding into the
excavated area and out from underneath the structure. Complicating the situation was the close
proximity of the neighbor to the east; stabilization and repairs had to continue without causing damage
to the neighboring home. Certified Foundations Inc. was contacted by the General Contractor, who was
aware of CFI’s longevity and quality reputation in the foundation stabilization industry. In conjunction
with this general contractor and the engineers of record, CFI was able to assist in providing stabilization
of the structure by injecting 333.5 gallons of chemical grout along 3 sides of the structure so that the
excavation could commencement.