Commercial Projects
|
|
|
AIG Building
Palm Harbor, Florida
Geotechnical:
CFTL
Clearwater, Florida
Structural:
BILL PAXTON
Tampa, Florida
This building was under construction and about to be finished when a sinkhole depression opened up near the back corner of this structure. The sinkhole developed when a well driller was setting the casing for an irrigation well. The well casing had punched into a subsurface cavern and triggered a small collapse. CFI injected 130 cubic yards of grout to help fill the
subsurface cavity. Following the pressure grouting program 8 underpins were installed to help secure the corner of the building.
|
|
|
|
|
|
|
|
|
|